Please log in to continue.
1 (a)
What is need of construction management? Discuss objectives of construction management.
7 M
1 (b)
Classify construction equipments on different basis with suitable examples.
7 M
2 (a)
Explain WBS of construction project. Discuss importance of WBS.
7 M
Solve any one question from Q2(b) & Q2(c)
2 (b)
State limitations of bar chart. What is Line Of Balance. State its application.
7 M
2 (c)
Explain:
1. Grade resistance
2. Coefficient of traction
3. Rimpull.
1. Grade resistance
2. Coefficient of traction
3. Rimpull.
7 M
Solve any two question from Q3(a), Q3(b) & Q3(c), Q3(d)
3 (a)
Explain dummy activity. State types of dummy activities with examples.
7 M
3 (b)
Draw AOA diagram for following data. Determine
1. critical path
2. project duration
3. Prepare table of floats.
1. critical path
2. project duration
3. Prepare table of floats.
| Activity (i-j) | 1-2 | 2-3 | 2-4 | 3-4 | 3-5 | 4-5 |
| Duration in days | 8 | 12 | 4 | 6 | 10 | 6 |
7 M
Differentiate between:
3 (c) (i)
CPM and PERT.
4 M
3 (c) (ii)
Resource smoothening and resource leveling
4 M
3 (d)
Determine optimum cost and corresponding project duration for the given data.
| Activity | Normal time | Normal cost | Crash time | Crash cost |
| 1-2 | 3 | 12000 | 2 | 16000 |
| 1-3 | 6 | 18000 | 3 | 24000 |
| 2-4 | 2 | 20000 | 1 | 23000 |
| 3-4 | 4 | 16000 | 2 | 21000 |
| 4-5 | 5 | 30000 | 4 | 35000 |
| Indirect cost = Rs. 3000/day | ||||
7 M
Solve any two question from Q4(a), Q4(b) & Q4(c), Q4(d)
4 (a)
Enlist methods of depreciation. Explain any one method with suitable example.
7 M
4 (b)
Classify bulldozers. State uses of bulldozers on construction projects.
7 M
4 (c)
Differentiate between power shovel and dragline with sketches.
7 M
4 (d)
Discuss factors affecting output of HOE.
7 M
Solve any two question from Q5(a), Q5(b) & Q5(c), Q5(d)
5 (a)
What is job layout? State factors affecting job layout.
7 M
5 (b)
Classify dump trucks on method of dumping. State selection factors for rear dump trucks.
7 M
5 (c)
Sketch typical belt conveyor system. Explain functions of following components of BCS.
1. Idlers
2. Feeder
3. Snub pulley.
1. Idlers
2. Feeder
3. Snub pulley.
7 M
5 (d)
Discuss safety measures for 1. Excavation. 2. Demolition.
7 M
More question papers from Construction management and Equipments